Before starting work, we come to the site and evaluate it. Measurements are made, we consider the soil and on the basis of the plan we calculate the amount of materials. We understand how important it is to save the budget and invest rationally, so the cost of building a base, we understand how important it is to save the budget and invest wisely, so the cost of building a base for tiles (sand, concrete, gravel) will meet the level of performance economic works. This means that you will not have any leftovers in the soil.
REQUIRED THICKNESS of paving slabs:
roadway, including trucks 8-10 cm
private yard for a car 6 cm
pedestrian zone 3-4 cm
Paving works: | Unit of measurement | Price |
---|---|---|
Laying of paving slabs, from gartsovka | m2 | from UAH 180 |
Laying granite paving | m2 | from UAH 250 |
Decorative elements | m2 | negotiable |
Laying granite paving | m2 | from UAH 250 |
Decorative elements | m2 | negotiable |
Laying granite paving | pcs | from UAH 250 |
Decorative elements | m2 | negotiable |
Laying granite paving | m2 | from UAH 250 |
Decorative elements | pcs | negotiable |